June 30, 2010

A Bridge Too Far? EPA’s War on Lead-Based Paint Takes Aim at Commercial Buildings

Posted on June 30, 2010 by Charles Efflandt

No one doubts that EPA’s war on lead-based paint serves the cause of mitigating an established health threat. With children being particularly at risk, the regulations to date have focused on lead-based paint in older homes and other “child-occupied facilities.” On May 6, 2010, however, EPA gave notice of its intent to take the battle to an undefined set of commercial and public buildings. Can a full-scale assault on commercial facilities, which will involve a more complex set of regulatory variables and which will venture farther from the core health risk concerns, succeed in achieving a proper balance of competing factors?

EPA’s May 6, 2010 Advance Notice of Proposed Rulemaking announcing the next step in the lead-based paint campaign was published only days after the April 22, 2010 effective date of the controversial Renovation, Repair and Painting Rule (“RRP Rule”). That rule regulates renovation and repair activities disturbing lead-based paint in older homes and child-occupied facilities. The RRP Rule affects contractors, landlords and others who perform RRP work for compensation.

The RRP Rule includes provisions for the required certification (for a fee) of firms performing covered RRP work, the training and certification (at a significant cost) of “Certified Renovators” through EPA-accredited classes, the required use of detailed RRP work practices when performing covered activities, the retention of compliance records, and the verification of compliance with work practice obligations. Even though the RRP Rule has a relatively narrow focus – residences and other child-occupied facilities – its requirements have generated substantial controversy.

Because the RRP Rule applies to numerous trades and contractors, as well as to certain landlords and other persons, issues related to obtaining the required training, safe implementation of the work practice requirements, costs of compliance and the possibility of a $37,500 per day, per violation penalty are only now being confronted by the regulated community as well as the regulators. Small contractors may be forced out of business, impacting competition. Needed RRP work may not be performed due to cost. Lead-contaminated waste disposal will create new environmental/health problems partially offsetting the benefits of the RRP Rule. Suffice it to say, EPA has not yet solved the numerous problems and complexities of implementing even these regulations focused on older homes and child-occupied facilities.

With this background, and setting aside for the moment legal mandates, one can reasonably question whether EPA is prepared to set its sights on a significantly more complex regulatory challenge- the renovation and repair of an estimated two to three million commercial and public facilities constructed prior to 1980. The ANPR includes no proposed language. Rather, the public is invited to respond to over 100 detailed questions and data requests.

At this time, the scope of EPA’s assault on the renovation and repair of commercial and public buildings is unknown. No current limitations on covered “commercial” and “public” buildings exist and both exterior and interior renovation and repair work are included in the ANPR. Unresolved questions include: What renovation and repair work should be covered? What activities create the most risk? Should exposure pathways be broadened to include nearby properties? How should the substantial amount of lead-contaminated waste be handled to avoid creating a different health and environmental hazard?

This much is known. The regulatory variables associated with extending the war on lead-based paint to commercial and public buildings are more numerous and the targeted health risks have expanded. I suggest that there is a real possibility that the regulations could fail to appropriately balance the legitimate interests of contractors, building owners and the public with the known and perceived health risks. Let us hope that the regulated community weighs-in on these issues and that the EPA gives careful thought to this next step in its campaign against lead-based paint.

The public comment period for this proposal ends July 6, 2010.

Tags: FederalHazardous MaterialsLeadTSCAToxic Tortstoxic substances

Enforcement | Federal | Hazardous Materials | Major Topics | Toxic Substances

Permalink | Comments (0)